DHL Bow NH
This project was an expansion to an existing and operational DHL distribution facility. It was constructed of a steel column and girt frame with exterior IMP walls. It is topped with a TPO roof system with an interior syphonic roof drain system. This project also involved large elevation change and has a 650 FT long block retaining wall that is 28 FT tall at the highest point.